How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 国产精品福利一区二区久久 | 狠狠综合久久av一区二区老牛 | 国产一区二区三区四区五区密私 | 一道久在线无码加勒比 | 国产裸舞福利在线视频合集 | 成人免费a级片 | 日产国产亚洲精品系列 | 精久久久久久 | 国产精品久久久久久久人人看 | 顶级欧美做受xxx000男同 | 欧美爱爱动态 | 被义子侵犯漂亮人妻HD | 国产成人片视频一区二区 | 国产自国产自愉自愉免费24区 | 91麻豆影视 | 欧美人与野鲁交xxx视频 | 成年人免费在线播放视频 | 国产美女高潮流白浆视频 | 智斗美女蛇 | 日韩激情无码一级毛片 | 26UUU另类亚洲欧美日本 | 欧美在线观看黄色 | 最近免费中文字幕 | 熟女少妇内射日韩亚洲 | 艳妇乳肉豪妇荡欧美片堕落 | 天天看高清特色大片 | 欧美aaaa视频| 狼群社区视频www在线观看 | 天天狠狠色综合图片区 | 午夜裸体性播放 | 久久久久久久99精品欧美产片 | 97日日碰人人模人人澡 | 伊伊人成亚洲综合人网香 | 国产精品免费网址 | 中文字幕一区二区三区在线不卡 | 黄色不卡 | 欧美日韩精品视频一区二区 | 中文国产在线观看 | 91av黄色| 影音先锋男人天堂 | 国产三级在线观看完整版 |