Maintenance and operation of new valve before commissioning

Time:2021-01-22
Pre-maintenance of new valves before operation is a progressive construction concept to protect valve seat seals from seat damage during installation, welding and commissioning

Pre-maintenance of new valves before operation is a progressive construction concept to protect valve seat seals from seat damage during installation, welding and commissioning.The pre-maintenance of the valve before it is put into use can make it better realize the functions of conduction, truncation and diversion. It is not only conducive to early detection of problems, timely troubleshooting, eliminating hidden dangers, but also to extend the operation period of the pipeline, which can better provide a basis for the operation and maintenance of the valve after it is put into operation.

The valve leakage mostly occurs in the early use, the main reason is in the pipeline construction operation is not standard caused by the sealing ring and valve ball scratches, these scratches if not timely repair, long-term pipeline leakage operation will cause serious consequences, and the switch limit is not in place caused by the leakage, damage to the sealing ring is also very serious.

Seat sealing ring is an important component of the valve, which belongs to soft sealing, sealing materials include nylon, fluorine rubber and other chemical compounds, and its sealing form includes O ring or embedded two ways.Sealing ring no matter what kind of material and installation, can not avoid wear and scour and hard damage, resulting in valve leakage.Therefore, protecting the valve seat is the top priority in valve maintenance.

Once the valve cannot be opened and closed, the sealing device is damaged, serious internal leakage occurs, the grease nozzle is blocked or external leakage and other faults occur, it is difficult to eliminate in time under the condition of pipeline pressure, and it is necessary to deal with the pressure after relief, which not only affects the production period, but also causes the waste of human and material resources and pollution of the environment.Therefore, it is very important to maintain the valve before it is put into operation.


主站蜘蛛池模板: 91porny丨首页| 久久99精品久久久久久青青91 | 边吃奶边扎下面好爽免费视频 | 国产日韩欧美色 | 国产麻豆久久 | 欧美劲爆婷婷五月久久 | 亚洲毛片欧洲毛片国产一品色 | 护士荡sao嗯啊~h | 鲁一鲁操一操 | 艳妇乳肉豪妇荡乳69xx福州 | 人人爽爽| 色爱99 | 无码天堂亚洲国产AV | 日韩一级黄色大片 | 久久av无码精品人妻系列果冻传媒 | 国产精品久久久久久吹潮日韩动画 | 亚洲男人影院 | 国产人妻无码一区二区三区婷婷 | 疯狂做爰xxxⅹ高潮羡一式视频 | 成年免费人香蕉视频在线 | 97se狠狠狠狼鲁亚洲综合网 | 免费999精品国产自在现线 | 国内精品国产三级电影av | 狠狠撸影视 | 狠狠色噜噜狠狠狠狠777米奇 | 青青免费在线 | 免费看少妇高潮一级毛片特黄 | 亚洲最大免费视频 | 一级全黄60分钟免费视频 | 色图自拍偷拍 | 偷拍福利视频一区二区三区 | 成人h精品动漫一区二区 | 国产精品久久久久久无码不卡 | 国产又爽又黄又爽又刺激 | 日产精品久久久久久久 | 无码av高潮抽搐流白浆 | 韩国成人一区 | 六月丁香色婷婷 | 免费国产羞羞网站视频 | 亚洲电影一级片 | 国产综合影院 |